TARC VII
Key facts
Updated on
About TARC VII
TARC VII is an upcoming ultra-luxury residential project by TARC Limited in New Delhi, and it is still in the planning and design stage rather than on the sales floor. The scheme carries about 1.0 million square feet of development potential on roughly 7 acres. Because the developer has framed it as a planned launch, the figures on this page come from its investor material and from the wider Delhi market, and we read them with a careful eye.
TARC describes the project as a one-of-a-kind destination that blends contemporary design, exclusivity and experiential living, set within lush landscapes. It is one of three Delhi schemes in the company's pipeline, alongside TARC V and TARC VI, which together total about 2.5 million square feet across about 17 acres. Land of this kind is rare in central Delhi, and that scarcity is the main reason buyers should pay attention to it.
Key Highlights
- About 1.0 million square feet of development potential on roughly 7 acres.
- Part of a three-scheme Delhi pipeline that totals about 2.5 million square feet across about 17 acres, with TARC V and TARC VI.
- Positioned as an ultra-luxury residential address in New Delhi, described by the developer as a one-of-a-kind destination.
- Approvals are described in the developer's investor material as being in place for the Delhi pipeline, with design finalisation under way.
- Setting described by the developer as surrounded by lush landscapes.
- The Golden Line Metro main route from Aerocity to Tughlakabad is due to be complete by the end of 2026.
- The developer's earlier Delhi project, TARC Tripundra in Kapashera, delivered three towers and 187 luxury residences, launched in October 2022.
Facts as on 27 August 2026, from the developer.
Location Advantages
TARC places the scheme in New Delhi without naming a sector or road, so anyone weighing a commute should ask for the precise address before comparing travel times. The wider transport picture, however, is moving quickly. The Golden Line runs from Aerocity to Tughlakabad, and by April 2026 about 73.33% of the overall project and 78% of its civil works were complete, with the main route due by the end of 2026. A 2 km Phase 5A link is planned from Aerocity, an interchange station, to IGI Airport Terminal 1. The Magenta Line extension from Krishna Park Extension to Deepali Chowk targets December 2026, and the Pink Line ring closure between Majlis Park and Maujpur completes India's first fully operational ring-metro corridor.
A word of caution is in order. Most of these lines are still under construction, so any commute planned around them should be tested against completion dates rather than against the promise of the network. Work around metro corridors often brings diversions, noise and dust for years before the stations open, and buyers should expect that during the build period.
Transit Links Serving the Area
| Link | Detail | Target |
|---|---|---|
| Golden Line (Aerocity to Tughlakabad) | Main route, 73.33% complete overall in April 2026 | End of 2026 |
| Golden Line extension (Tughlakabad to Kalindi Kunj) | Extension of the same corridor south-east | 2028 |
| Phase 5A Aerocity-IGI Airport link | 2 km link with stations at Aerocity and IGI Airport Terminal 1 | Late 2028 |
| Magenta Line extension | Krishna Park Extension to Deepali Chowk | December 2026 |
Amenities
The developer describes the setting as surrounded by lush landscapes and complemented by world-class amenities. Its Kapashera project, TARC Tripundra, offers cycling tracks, a yoga centre, a gym, swimming pools, a sauna and spa, and 7D security features, with earthquake-compliant structure designed for Zone 5. Its Kirti Nagar project on Patel Road, TARC Kailasa, carries about 170,000 sq ft of club amenities, including an Olympic-length swimming pool and a forest court laid out in six layers.
Upcoming Infrastructure
- Golden Line Metro, Aerocity to Tughlakabad: under construction, main route due by the end of 2026. It will be the most direct rail link for this scheme once it opens.
- Golden Line extension, Tughlakabad to Kalindi Kunj: expected to be completed by 2028, extending the corridor further into south Delhi.
- Delhi Metro Phase 5A, including the Aerocity to IGI Airport Terminal 1 corridor: the Union Cabinet approved it on 24 December 2025, with completion targeted for late 2028.
- Delhi Metro Phase 5B: a 97 km, seven-corridor expansion approved in February 2026, with construction expected after 2028.
Price & Configuration
TARC has not yet put a unit price or a configuration grid on record for this scheme, so buyers should treat any number they see online with caution until the developer releases its own sheet. The developer's recent Delhi pricing gives a useful yardstick. TARC Kailasa at Kirti Nagar on Patel Road starts at ₹11 Cr for 3.5 BHK units of 3,440 sq ft, with a rate of ₹31,977 per sq ft plus charges, as of 5 August 2026. At Kapashera, TARC Tripundra offers 3 and 4 BHK homes of 2,198 to 2,598 sq ft, starting at ₹6 Cr. Both figures are for the developer's other projects, and this scheme will be priced on its own merits.
Launch & Possession Timeline
- 6 February 2025: TARC's investor presentation lists TARC VII as a New Delhi luxury development.
- 7 February 2026: the Q3 FY26 investor presentation names TARC V, VI and VII as the three planned developments, with approvals in place and design finalisation under way.
- 1 March 2026: TARC says it will prioritise Delhi and Gurugram in FY27, with phased launches.
- 29 May 2026: the FY26 filing reports advanced design finalisation across the upcoming luxury and ultra-luxury pipeline.
- 27 August 2026: the investor filing describes the three Delhi schemes as in advanced stages and the pipeline as nearing launch readiness.
Facts as on 27 August 2026, from the developer.
RERA & Approvals
TARC's investor material dated 7 February 2026 and 27 August 2026 states that approvals are in place for the Delhi pipeline, which includes this scheme. This project is not yet RERA registered and is not open for sale or booking until registration. Buyers should ask for the RERA project number, the registration authority and the approval documents before committing any money, and should check the sanctioned plan against the brochure they are shown.
Investment Analysis
- Price against the locality: no unit price has been set for this scheme, so the useful benchmark is TARC's own Kirti Nagar project at ₹31,977 per sq ft plus charges, as of August 2026.
- Demand: the developer says demand has held up in the premium and ultra-luxury segments even though overall sales softened.
- Supply: TARC describes its Delhi sites as concentrated in supply-constrained micro-markets, which tends to protect the value of scarce land in the long run.
- Infrastructure: Phase 5A and 5B and the Golden Line extensions add rapid-transit links across west, south and north Delhi, which should widen the buyer pool for a premium address.
- Timing: because the project is still at the design stage, buyers entering now will be paying for a promise rather than a finished building, and the appreciation case depends on the metro network arriving on schedule.
- Alternatives: the developer's Kapashera homes at ₹6 Cr and above and its Kirti Nagar homes at ₹11 Cr and above offer completed or near-complete product with a known track record.
Pros and Cons
Pros
- A scarce ultra-luxury site of about 7 acres in a city where new land is hard to secure.
- Access to a growing metro network, with the Aerocity and airport links and the Magenta and Pink line extensions in progress.
- A developer with a listed parent, a 450-acre land bank across Delhi NCR and handovers that have started at Tripundra.
- Recognition for luxury delivery, with Luxury Project of the Year awards for TARC Tripundra in 2023 and TARC Kailasa in 2024.
Cons
- No unit price, launch date or RERA registration has been set, so the cost and timing of buying in remain uncertain for now.
- The scheme is placed only in New Delhi, so buyers must confirm the exact sector and road before judging connectivity.
- Much of the metro network that gives the location its appeal is still under construction, with the Golden Line only about three-quarters complete in April 2026.
- TARC has said overall sales softened, and its five-year cashflow projection covers upcoming developments in general rather than this scheme on its own.
Who Should Buy This
Ideal for: buyers who want an ultra-luxury address in New Delhi and can wait for construction, families planning to settle in the city over the long term, and investors with a patient horizon who value scarce land.
Not ideal for: buyers who need a home within a year, anyone who depends on a fixed price or a confirmed possession date today, and those who cannot carry the risk of a metro network still under construction.
Home Loans & Charges
| Charge | Amount |
|---|---|
| Stamp duty, Delhi (men) | 6% including MCD transfer duty; 7% where the MCD 1% addition applies above ₹25 lakh |
| Stamp duty, Delhi (women) | 4%; 5% where the MCD 1% addition applies |
| Stamp duty, Delhi (joint male-female) | 5%; 6% where the MCD 1% addition applies |
| Registration fee | 1% of the higher of deal value or circle rate, plus ₹100 pasting charge |
These stamp duty and registration rates were checked against the 2026 Delhi schedule on 23 October 2026. Confirm them with your advocate at the time of booking.
About the Developer
TARC was incorporated in 2016 and is listed on both BSE and NSE, with a 450-acre owned land bank across Delhi NCR. Its Delhi record includes TARC Tripundra in Pushpanjali Greens on Main Bijwasan Road, Kapashera, with three towers and 187 luxury residences launched in October 2022. The occupancy certificate arrived in FY26 and handovers began in the last quarter of that year. The company says the project was delivered within its timeline, and a listing platform describes its record as strict RERA compliance.
FAQ — Frequently Asked Questions
Q: What is TARC VII?
A: TARC VII is an upcoming ultra-luxury residential project by TARC Limited in New Delhi, with about 1.0 million square feet of development potential on roughly 7 acres.
Q: Is TARC VII near a metro station?
A: The sector and road are not yet on the developer's public record, but the Golden Line Aerocity to Tughlakabad main route is due by the end of 2026, with an Aerocity interchange planned as part of the Phase 5A link.
Q: Is TARC a reliable developer for luxury homes?
A: TARC Limited, incorporated in 2016 and listed on BSE and NSE, delivered TARC Tripundra in Kapashera with 187 residences and won Luxury Project of the Year awards in 2023 and 2024.
Q: Is TARC VII a good investment in Delhi?
A: The case rests on scarce land in supply-constrained micro-markets and on metro links that are still being built, so buyers should weigh the timing risk alongside the upside.
Q: How big is the TARC VII project?
A: The scheme has about 1.0 million square feet of development potential on roughly 7 acres, and it forms part of a three-scheme Delhi pipeline totalling about 2.5 million square feet on about 17 acres.
Questions & Answers (0)
Terms & Conditions — Q&A
By submitting a question on RealtyPromoo, you agree to these terms:
1. Content Policy
- Your question must be a genuine real estate query.
- No abusive, defamatory, or promotional content.
- No personal contact info, broker referrals, or spam.
- Questions are reviewed by AI and may be edited for clarity, grammar, or politeness before publication.
2. Publication
- Your first name + last initial (e.g., "Rahul S.") will be displayed publicly with the answer.
- Your full name, phone number, and email are never displayed publicly.
- Once published, your question and answer become part of RealtyPromoo's content.
3. Phone & Email
- Your phone number is required so our team can share the answer with you on WhatsApp and assist with your query.
- Your phone number and email are stored securely and may be used by RealtyPromoo or its sales team to contact you regarding your query or related properties.
4. Answer Accuracy
- Answers are generated by AI based on publicly available information and the page context.
- Answers are informational only — not financial, legal, or investment advice.
- Always verify pricing, RERA status, and possession dates with the developer before any transaction.
- RealtyPromoo is not liable for decisions made based on AI-generated answers.
5. Pre-RERA / Pre-Launch Projects
- Some listed projects are pre-RERA / pre-launch. These listings are informational only.
- No booking, sale, or agreement is permitted before RERA registration.
- "Express Your Interest" forms collect contact details for future communication, not advance bookings.
6. Moderation
- RealtyPromoo reserves the right to delete, edit, or refuse to publish any question or answer.
7. Privacy
- Your data is handled per our Privacy Policy.
8. Jurisdiction
- These terms are governed by the laws of India.
- Disputes are subject to the courts of Noida, Uttar Pradesh.
Be the first to ask a question. Get an answer in seconds.
Questions & Answers
This page was drafted by Devendra Singh, Senior Real Estate Analyst (Freelancer) after an on-site visit, with research support from artificial intelligence. AI assisted in compiling information from public sources, and the final content was reviewed by our editor before publishing. We update listings as new information becomes available.
Sources consulted: On-site visit by author · Developer official website · State RERA portal verification · Google Maps location data · YouTube site-visit walkthroughs · Direct broker network.
Last reviewed: 14 November 2026 · Spot an error? Let us know
More projects by TARC
Related Projects
In the News
News
TARC's Ultra-Luxury Delhi Pipeline Tests Demand in Supply-Tight Micro-Markets
TARC's ultra-luxury TARC VII in Delhi has about 1.0 million sq ft of development potential on 7 acres and is nearing launch readiness. Read the market.
News
TARC VI Adds Ultra-Luxury Supply to Delhi's Pipeline on Owned Land
TARC plans TARC VI, an ultra-luxury Delhi project of about 0.5 million sq ft on owned 3-acre land with approvals in place. What it means for Delhi buyers.
Investment
TARC's Three New Delhi Schemes Signal Tighter Luxury Supply Ahead
TARC names three planned Delhi ultra-luxury schemes, TARC V, VI and VII, with approvals in place. FY30 cashflow guidance is about ₹4,000 crore. Watch the.

