Piramal's Phase 2 Tower in Balkum: What It Means for Thane West Prices
New Launch

Piramal's Phase 2 Tower in Balkum: What It Means for Thane West Prices

RealtyPromoo Research Desk · Independent and uninfluenced by developers or brokers — we sell nothing. Claims verified against RERA and public records.

Piramal Vaikunth Cluster 3B Pre-Launch Opens in Balkum, Thane West

Piramal Vaikunth Cluster 3B is a 51-storey residential tower by Piramal Realty in Balkum, Thane West, offering 2 BHK and 3 BHK homes with carpet areas of 719 to 1,049 sq ft. The project is in its Pre-Launch status and the price has not been announced yet. It is the first residential tower under Phase 2 of the Piramal Vaikunth township, and bookings have opened following the launch.

Facts as on July 2026, from RERA / the developer.

On 23 July 2026, Piramal Realty announced Phase 2 of Piramal Vaikunth, with Cluster 3, Tower 3 as the lead residential tower. The phase carries an estimated gross development value of ₹4,700 crore and an estimated investment of ₹3,600 crore. The tower is registered with MahaRERA under number PR1332022601156, and at 51 storeys it is the tallest tower in the township.

Impact on Homebuyers

For buyers in Thane West, a launch of this size adds fresh supply to a corridor that already sees steady demand. Market data puts outright rates for ready and under-construction projects in Thane West between ₹9,300 and ₹12,700 per sq ft, as of October 2026. An earlier tower in the same township listed its 2 BHK homes at ₹1.18 to ₹1.25 crore as of July 2026, with carpet areas of 511 to 530 sq ft.

If you are buying to live in, the timeline is the first thing to weigh. The developer's possession date is June 2032, though some earlier listings for the same tower quoted October 2032. That is a long wait, so compare it with ready homes nearby before you commit. There are also a few points to keep in mind: the price is not set, the payment schedule is yet to be shared, and the tower's appeal depends partly on metro lines that are still being built.

Expert Analysis

Thane city recorded 16,386 housing units sold in Q2 2026, up 10% from a year earlier. That tells you the city is absorbing new supply rather than stalling. Thane West has also appreciated 26.4% over five years and 34.8% over ten, based on the market data we track. Past gains do not guarantee the next five years, but the pattern explains why developers keep launching here. The real driver is connectivity. This township sits close to a proposed metro interchange, and that is what sets this launch apart from older Balkum stock. Buyers who enter at pre-launch usually have room to negotiate on price, while later buyers pay for the construction progress already visible on site.

What to Expect Next

Metro Line 5 is the timeline to watch. Its first phase, running from Kapurbawdi to Dhamankar Naka over 12.2 km, is more than 95% complete and has a late 2026 launch window. The state approved a revised ₹18,131 crore plan for the line in April 2026. The Thane Integral Ring Metro, with 29 km and 22 stations, is expected to be operational by 2029, and the Thane–Borivali twin tunnel is targeting around 2028. For this tower, the price announcement and payment schedule should come first, followed by construction updates.

Related Projects and Areas Affected

  • Balkum Naka: the nearest Metro Line 5 station will lift access and demand for homes in the immediate area.
  • Kapurbawdi: the proposed Line 4 and Line 5 interchange sits about 0.5 km from the site.
  • Earlier towers of Piramal Vaikunth: the township's Cluster 3 tower is the closest pricing benchmark for this launch.
  • A Kalpataru tower in Thane West: a useful 2 BHK comparison in the same micro-market.

BHK Types and Carpet Area

The tower offers 2 BHK and 3 BHK residences, with carpet areas between 719 and 1,049 sq ft across both types. Eight residences share each core, and every home comes with a private deck, including a living-room deck. Layouts are Vastu-compliant, and the homes look out over Thane Creek and Yeoor Hills.

Price and Payment

The price for Piramal Vaikunth Cluster 3B has not been announced yet. One indicative listing puts Phase 2 entry prices from about ₹1.59 crore, but that figure is not tied to any configuration, so treat it as a rough guide only. Piramal says pre-launch payments are typically linked to construction milestones, and the schedule is yet to be shared. Before you book, ask for the per sq ft rate, parking and maintenance charges in writing.

Possession Date and RERA Registration

The developer's possession date for this tower is June 2032. The project is registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under registration number PR1332022601156. Check the project details on the MahaRERA portal before you sign anything.

Location and Travel Times

The project sits on Old Mumbai-Agra Road, near Shivaji Nagar and Balkum Naka, in Thane West, with PIN code 400607. Key distances are:

  • Eastern Express Highway: about 1.3 km
  • Kapurbawdi metro station (Line 4 and Line 5 interchange, proposed): about 0.5 km
  • Balkum Naka Metro Line 5 station: the second stop after Kapurbawdi
  • Thane Railway Station: 5.1 km, about 25 to 40 minutes by road before the metro opens

Nearby schools in Balkum include DAV Public School and CP Goenka International School, while Currae Speciality Hospital and Jupiter Hospital serve the area for healthcare.

Piramal Realty's Track Record

Piramal Realty was founded in 2012 by Anand Piramal and is headquartered in Mumbai. It works only in Mumbai and the Mumbai Metropolitan Region, with nearly 12 million sq ft under development. The company says it has handed over more than 4,200 homes across 21 towers and six projects. The first Piramal Vaikunth Phase 1 handover came in November 2022, Cluster 4 received its occupancy certificate on 27 December 2023, and the Club V clubhouse opened in September 2024. An aggregator rating puts 70% of its towers as delivered within six months of the committed date. The flip side is that Piramal is privately held and does not publish audited results, so buyers rely on project-level records.

Amenities

Cluster 3B residents get a podium with a residents-only pool, gymnasium, pickleball court, banquet hall and indoor games room. Township facilities include the Club V clubhouse of about 47,000 sq ft, with a squash court, mini cricket ground, yoga terrace, library, cafeteria and doctor's room. Families get a crèche, toddlers' play area, kids' pool, and cycling and jogging tracks of 1.5 km and 1.6 km. The township also has Thane's first ISKCON temple, Sri Sri Radha Govindadeva Mandir, inside a residential development. Open space covers up to 40% of the township, and amenity space totals about 1.71 lakh sq ft.

Floor Plans

Floor plans for the 2 BHK and 3 BHK layouts are yet to be released. When they arrive, check the carpet area against the super built-up figure, the size of the decks, and the unit's position on the floor, since eight homes per core affect privacy and light.

Questions Buyers Ask

What is the price of Piramal Vaikunth Cluster 3B?
The price has not been announced yet, because the project is in its Pre-Launch status. An earlier 2 BHK tower in the same township was listed at ₹1.18 to ₹1.25 crore as of July 2026.

What BHK types are available?
The tower offers 2 BHK and 3 BHK homes with carpet areas from 719 to 1,049 sq ft.

When will Piramal Vaikunth Cluster 3B be ready?
The developer's possession date for this tower is June 2032.

Is Piramal Vaikunth Cluster 3B RERA registered?
Yes, it is registered with MahaRERA under number PR1332022601156.

Questions & Answers (0)

Popular:

Be the first to ask a question. Get an answer in seconds.

How this page was written

This article was drafted by Pooja Nair, Real Estate Content Writer (Freelancer) with research support from artificial intelligence. AI assisted in gathering and summarizing information from primary news sources and official statements, and the final content was reviewed by our editor before publishing. News pages are timestamped at the time of writing and are not updated after publication.

Sources consulted: Primary press releases & company statements · Tier-1 business news (Economic Times, Livemint, Moneycontrol, Business Standard) · BSE / NSE corporate disclosures · Government notifications · State RERA filings (where relevant).

Published: 11 November 2026 · Spot an error? Let us know

Projects mentioned in this article

Piramal Vaikunth Ready to Move

Piramal Vaikunth

by Piramal Realty

Clusters 1, 2 & 4/4A delivered · Cluster 3 nearing possession · Phase II under construction

Balkum, Thane

₹56 L - ₹4.25 Cr

1 BHK, 1 BHK+Study, 2 BHK, 2 BHK+Study, 3 BHK, 4 BHK+Study, Townhomes

RERA Possession December 2025
Piramal Vaikunth Vidhaan New Launch

Piramal Vaikunth Vidhaan

by Piramal Realty

Phase 1 clusters delivered · Phase 2 launched with Cluster 3 Tower 3 as its first residential tower

Balkum, Thane

₹1.57 Cr - ₹2.59 Cr

2 BHK, 3 BHK

RERA Possession October 2032

Developers mentioned

Locations covered

Cities

Localities

Related News

Ask the Research Desk

Verified answers from RERA and public records — no spam.