Birla Trimaya Phase 4 — 1 BHK, 2 BHK, 3 BHK, 3.5 BHK, 4 BHK Duplex — Shettigere, Devanahalli, North Bangalore — Bangalore

Project render of Birla Trimaya Phase 4 by Birla Estates Private Limited.

Birla Trimaya Phase 4

City
Price
₹85 L – ₹4.30 Cr
Configurations
1 BHK, 2 BHK, 3 BHK, 3.5 BHK, 4 BHK Duplex
Possession
December 2031
Status
New Launch
RERA
PRM/KA/RERA/1250/303/PR/290126/008436

About Birla Trimaya Phase 4

Birla Trimaya Phase 4 — branded "The Bay" — is the fourth and latest phase of a 52-acre integrated township by Birla Estates on Shettigere Road, Devanahalli, North Bangalore. The overall township spans 28 towers and 2,600 homes; Phase 4 alone comprises 7 towers of G+14 floors with approximately 548 homes. Designed around the concept of a curated waterfront lifestyle, it offers 1, 2, 3, and 4 BHK duplex configurations within one of the largest gated communities on Bangalore's airport corridor. Phase 1 sold out in under 36 hours and Phase 4 has already clocked ₹650 crore in bookings with 85%+ inventory absorbed, signalling exceptionally strong market acceptance.

Key Highlights

  • 52-acre integrated township across all phases — 2,600 homes, 28 towers, 73–80% open space
  • Phase 4 — "The Bay": 7 towers, G+14 floors, ~548 homes, RERA registered January 2026
  • Three grand clubhouses totalling ~75,000 sq. ft. across the township — sports, leisure, business
  • 2.5-acre man-made curated lake with walk-over bridge — a rare feature in this price band
  • Airport proximity: ~7 km from Kempegowda International Airport (KIAL), ~2–3 min to NH-44
  • Upcoming Doddajala Metro Station (Namma Metro Blue Line/Airport Line) ~2.5–3.4 km from site
  • Designed by Broadway Malyan — internationally acclaimed architecture firm
  • ₹650 crore bookings in Phase 4 alone; total township cumulative bookings at ₹2,459 crore

Location Advantages

Birla Trimaya sits on Shettigere Road, Devanahalli — about 40 km northeast of Bangalore's city centre. The location is genuinely strong for airport connectivity (20-minute drive to KIAL), proximity to KIADB Aerospace Park, Hardware Park, and IFCI Financial City. Bellary Road (NH-44) is just 2–3 minutes away. Hebbal and Manyata Tech Park are roughly 25–30 km south — a realistic 35–50-minute commute in normal traffic, which rises steeply during peak hours. That is the honest catch here: Shettigere is not close to central or south Bangalore. Residents working in Whitefield, Electronic City, or Outer Ring Road tech corridors will face long daily commutes. The upcoming Namma Metro Blue Line's airport extension — with Doddajala Station being the nearest stop — is still pending full completion. Once operational, connectivity will improve materially. On the positive side, the immediate micro-location is quiet, green, and largely free of inner-city congestion.

What's Nearby — Schools, Hospitals, Malls

Category Name Distance Drive Time
School (IB/IGCSE) Stone Hill International School ~8 km ~12 min
School (CBSE) Delhi Public School (Devanahalli) ~10 km ~15 min
School (CBSE) Aravindh International School ~14 km ~20 min
University REVA University ~14 km ~20 min
Engineering College Sir M. Visvesvaraya Institute of Technology ~10 km ~12 min
Hospital (Multi-specialty) Aster CMI Hospital (Hebbal) ~25 km ~35 min
Hospital (Multi-specialty) Omega Multispeciality Hospital ~12 km ~18 min
Hospital (Multi-specialty) Trust Aid Hospital ~5 km ~10 min
Mall / Retail The Galleria Mall (Yelahanka) ~18 km ~25 min
Mall / Retail Bhartiya Mall of Bengaluru ~22 km ~30 min
Supermarket DMart (Yelahanka) ~18 km ~25 min
Entertainment Big Brewski Brewhouse ~20 km ~28 min
Tech Park Prestige Tech Cloud ~4.7 km ~8 min

Note: Good schools and super-specialty hospitals are 18–25 km away. The immediate Shettigere neighbourhood has basic medical and retail options, with larger facilities requiring a committed drive. This is expected to improve as the area develops.

Amenities

The township's amenity backbone spans three themed clubhouses totalling ~75,000 sq. ft., designed for sports, leisure, and co-working lifestyles respectively. Here's what Phase 4 residents access across the full township:

  • Fitness & Wellness: Fully equipped gymnasium, aerobics studio, yoga and meditation deck, steam room, sauna, jacuzzi, foot reflexology path
  • Water: Swimming pool + dedicated kids' pool; 2.5-acre curated man-made lake with walk-over bridge
  • Sports: Lawn tennis court, basketball court, cricket arena, badminton courts, squash court, sand volleyball pit, skating rink, table tennis, VR gaming zone
  • Kids: Multiple children's play zones, sand play area, dedicated kids' pool
  • Outdoors: Jogging and cycling tracks, landscaped gardens, fragrance garden, amphitheatre, picnic zones, barbeque spaces, park pavilions, pet park
  • Social & Convenience: Three grand clubhouses, multipurpose party hall, co-working lounge, convenience retail within township
  • Security: 24/7 manned security, CCTV surveillance across premises, controlled entry/exit, intercom connectivity
  • Infrastructure: Power backup, high-speed lifts, WiFi, basement + ground parking, fire sprinklers, waste management

Price & Configuration

The prices below are indicative based on publicly available listings for the Birla Trimaya township (Phase 4 specific cost sheet is available on request). Note that all areas listed are carpet area (approximate) as referenced across property portals.

Type Carpet Area (sq. ft.) Super Built-Up Area (sq. ft.) Indicative Price Approx. Price/sq. ft.
1 BHK ~480 ~685 ₹85 Lakhs onwards ~₹12,400/sq. ft. (carpet)
2 BHK ~800 ~1,115 ₹1.35 Cr onwards ~₹12,100/sq. ft. (carpet)
3 BHK ~1,110 ~1,590 ₹1.75 Cr onwards ~₹11,700/sq. ft. (carpet)
3.5 BHK ~1,450 ~2,100 ₹2.20 Cr onwards ~₹10,500/sq. ft. (carpet)
4 BHK Duplex ~2,500 ~3,600 ₹4.30 Cr onwards ~₹12,000/sq. ft. (carpet)

Payment Plan: Construction-linked plan (CLP) is the primary option. An initial booking amount of ~10% is required. The developer also offers a "pay some now, nothing till possession" scheme for eligible buyers. Floor rise charges, PLC, GST, maintenance corpus, and parking are additional. SBI, HDFC, ICICI, and Axis Bank have all approved the project for home loans.

⚠️ Price Disclaimer: Prices shown are indicative and sourced from publicly available listings. Actual cost may vary based on floor rise, PLC (Preferential Location Charge), parking, GST, registration and developer-specific charges. Contact us for the latest verified cost sheet.

Construction Progress

Phase 4 received its Karnataka RERA registration on 29 January 2026 (RERA No: PRM/KA/RERA/1250/303/PR/290126/008436). The RERA-registered possession date is December 2031. As of early 2026, the project is in its early construction stage with foundation and structural work underway. Phase 1 (launched September 2023) is in advanced construction with possession targeted by October 2028 as per RERA. Birla Estates has maintained a consistent launch-to-RERA track record across all four phases — each phase received RERA approval shortly after launch, which is a positive compliance signal. No delays have been reported for earlier phases at this stage, but buyers should note that Phase 4 has a ~5.5-year construction timeline ahead.

Investment Analysis

  • Price vs. locality average: Birla Trimaya's average asking price is ~₹13,200/sq. ft. compared to Devanahalli's locality average of ~₹9,200/sq. ft. — a 43% premium. That premium is partly justified by brand, township scale, and greenery, but buyers should factor it in carefully.
  • Appreciation trend: Property prices in the Shettigere–Devanahalli corridor have risen ~46% between 2017–2025. Devanahalli locality prices have shown ~4.2% growth in the last quarter alone, driven by airport corridor demand.
  • Rental yield: Devanahalli monthly rents range ₹20,000–₹97,500. A 2 BHK at ~₹1.35 Cr could fetch ₹30,000–₹35,000/month, implying a gross yield of ~2.7–3.1%. Not spectacular, but above-average for Bangalore premium projects — and likely to improve post-possession as the area matures.
  • Resale demand: Phase 1 sold out in 36 hours; Phase 4 hit 85%+ absorption quickly. Resale liquidity should be healthy given brand loyalty within the township.
  • Competing projects in the same corridor:
    • Godrej Ananda (Bagalur): ₹65 L – ₹1.34 Cr | Smaller units, more affordable entry
    • Brigade El Dorado (Bagalur): ~₹8,500/sq. ft. | Lower price, lesser brand premium
    • Prestige Devanahalli projects: ~₹9,000–10,000/sq. ft. | Strong brand but smaller community
  • Key risk: Devanahalli's growth story depends heavily on metro completion and KIADB SEZ employment ramp-up. Any delays to these will slow appreciation.

Pros and Cons

Pros

  • Aditya Birla Group brand trust: 125+ year legacy; Birla Estates has maintained transparency and RERA compliance across all four phases at Trimaya
  • Scale and amenity depth: 75,000 sq. ft. across three clubhouses, a 2.5-acre lake, 50+ amenities — very few township projects in this corridor match this
  • Low density for scale: 2,600 units across 52 acres translates to a density that feels open and liveable — more so than most high-rise projects
  • Strong sales track record: Phase 1 sold out in 36 hours, Phase 4 at 85%+ — genuine buyer demand, not just marketing noise
  • Airport corridor premium growth: The area around KIAL has seen consistent appreciation, supported by Aerospace SEZ, IFCI Financial City, and planned metro

Cons

  • Price premium over locality: At ~₹13,200/sq. ft. vs. a Devanahalli average of ~₹9,200/sq. ft., you're paying a 40%+ brand premium. Comparable units in nearby projects cost significantly less
  • Long possession timeline: December 2031 is over 5.5 years away. A lot can change — construction risk, developer stress, market cycles — over that period
  • Location is peripheral: Shettigere is ~40 km from central Bangalore. Commute to Whitefield, Koramangala, or Electronic City will easily cross 1.5–2 hours in peak traffic — a real daily pain point
  • Metro is still upcoming: The Doddajala Metro Station has been "upcoming" for a while. Until it is operational, public transport options remain limited
  • Social infrastructure still developing: Good schools, tier-1 hospitals, and malls are 15–25 km away. The immediate Shettigere area is not fully mature yet

Who Should Buy This

Ideal for: IT professionals working in North Bangalore's airport corridor (Manyata Tech Park, KIADB SEZ, Prestige Tech Cloud); frequent flyers who value airport proximity; families seeking a low-density, green township lifestyle; NRI investors seeking a credible, RERA-backed long-term asset with appreciation potential in a defined growth corridor.

Not ideal for: Anyone working in South, East, or Central Bangalore — the daily commute will be punishing. Also not suited to buyers needing possession in the next 2–3 years, or those on a tight budget who cannot absorb the brand premium over competing Devanahalli projects.

Site Visit Videos

FAQ — Frequently Asked Questions

Q: Is Birla Trimaya Phase 4 RERA registered?

A: Yes. Birla Trimaya Phase 4 is registered with Karnataka RERA under Registration No. PRM/KA/RERA/1250/303/PR/290126/008436, approved on 29 January 2026. You can verify details at rera.karnataka.gov.in.

Q: What is the possession date for Birla Trimaya Phase 4?

A: The RERA-registered possession date for Phase 4 is December 2031. The project was registered in January 2026, giving a construction timeline of approximately 5.5 years.

Q: What is the price range for Birla Trimaya Phase 4?

A: Indicative prices range from ₹85 Lakhs for a 1 BHK to ₹4.30 Crores for a 4 BHK Duplex. The average asking price across configurations is approximately ₹13,200/sq. ft. on carpet area. Contact us for the Phase 4-specific cost sheet including all additional charges.

Q: Is Birla Estates a reliable builder?

A: Birla Estates is a wholly-owned subsidiary of Century Textiles and Industries Limited, part of the Aditya Birla Group with a 125+ year legacy. The company entered real estate in 2016 and has maintained RERA compliance across all four Trimaya phases. No major delay complaints have surfaced for earlier phases so far, though Phase 1 possession is still upcoming (2028).

Q: What is the nearest metro station to Birla Trimaya Phase 4?

A: The nearest upcoming metro station is Doddajala Metro Station on the Namma Metro Blue Line (Airport Line), approximately 2.5–3.4 km from the project. The station is not yet operational as of mid-2026 — once open, it will significantly improve public transport access.

Q: Is Birla Trimaya Phase 4 good for investment?

A: The Devanahalli corridor has shown ~46% price appreciation between 2017–2025 and strong demand from airport-related employment. Phase 4's early sell-out and ₹650 crore bookings indicate healthy demand. However, you are paying a 40%+ premium over the locality average. This is a long-horizon investment (5+ years) that depends on metro connectivity and SEZ employment growth materialising as planned.

Q: How far is Birla Trimaya Phase 4 from Kempegowda International Airport?

A: The project is approximately 7 km from KIAL, translating to a 15–20-minute drive in normal conditions. The project is located on Shettigere Road before the Devanahalli toll.

Q: What configurations are available in Phase 4?

A: Phase 4 — "The Bay" — offers 1 BHK, 2 BHK, 3 BHK, 3.5 BHK, and 4 BHK Duplex configurations across 7 towers of G+14 floors. Home sizes range from approximately 485 sq. ft. (1 BHK SBU) to 2,551 sq. ft. (4 BHK Duplex SBU).

Q: Has Phase 4 started construction?

A: Phase 4 received RERA approval in January 2026 and is now in early construction. Foundation and structural work has commenced. Given the December 2031 RERA possession deadline, buyers should track quarterly construction updates on the Karnataka RERA portal.

How this page was written

This page was drafted by Baliram Birajdar, Principal Market Correspondent after an on-site visit, with research support from artificial intelligence. AI assisted in compiling information from public sources, and the final content was reviewed by our editor before publishing. We update listings as new information becomes available.

Sources consulted: On-site visit by author · Developer official website · State RERA portal · 99acres · MagicBricks · Housing.com · SquareYards · Google Maps · YouTube site-visit walkthroughs.

Last reviewed: 21 April 2026 · Spot an error? Let us know

Related News

EMI Calculator — Birla Trimaya Phase 4

Estimate your monthly EMI for this project

Estimated Monthly EMI

Related Projects

EXPRESS YOUR INTEREST